Update on the tank….
Last week, the initial plumbing had a drip leak. The leak was above the uv. Unfortunately there was only 1 union so I had to cut the pipe and redo the back side.
This week, The aquascape is done!
I’m pretty nervous about lifting the structure to place it inside the...