Friday, september 10, 2021 - completion of section1
Planning the drill holes to connect tank1 to section2. Also planning the optional overflow.
Glued in a vertical brace to protect drillholes against forces from the front panel.
Bolted stand of section 1 to the wall.
Rewired and placed new poweroutlet for the airco unit.
- Next job: extend section 2 stand from 4 to 5 meter.
https://youtube.com/user/glennfhome
Planning the drill holes to connect tank1 to section2. Also planning the optional overflow.
Glued in a vertical brace to protect drillholes against forces from the front panel.
Bolted stand of section 1 to the wall.
Rewired and placed new poweroutlet for the airco unit.
- Next job: extend section 2 stand from 4 to 5 meter.
https://youtube.com/user/glennfhome