Forgot to mention. I did drill the left tank for a standard float valve Rodi input and two 1/4” bulk heads on the very top for ato fill and Kalkwasser reactor fill. Also drilled for a low and high optical sensor which ran off my apex programming to fill the reservoir. Rodi system ran on a solenoid and optical sensors would let it know when to fill and shut off.