Looking to get some input on which way to plumb my return and build a manifold...
I mocked it up 2 different ways and wanted to know which was better.
Here's the first one..
Comes up into a wye... Then out the side into 2 Tees then continues on up to tank(basically manifold and return on same line)
Also coming out the top of the wye where the cap is I'm going to stub out for future(or water change valve)
No here is the second way
Up into a wye then out the side of the wye straight into the returns.. Then out of the top of the wye would come the manifold 2 tees.. Basically return and manifold in separate lines
then I'll stub out again for future(or water change valve)
Let me know what the pros and con's are and which way I should go..
Thanks
Sent from my Nexus 5 using Tapatalk
I mocked it up 2 different ways and wanted to know which was better.
Here's the first one..
Comes up into a wye... Then out the side into 2 Tees then continues on up to tank(basically manifold and return on same line)
Also coming out the top of the wye where the cap is I'm going to stub out for future(or water change valve)
No here is the second way
Up into a wye then out the side of the wye straight into the returns.. Then out of the top of the wye would come the manifold 2 tees.. Basically return and manifold in separate lines
then I'll stub out again for future(or water change valve)
Let me know what the pros and con's are and which way I should go..
Thanks
Sent from my Nexus 5 using Tapatalk