Got some plumbing done and am doing a water test now. I need a 3" hole saw to drill the hole in sump for bulkhead to attach the pump. Once I drill that I will build the manifold. I got all the plumbing done behind the tank, placed foam under the stand and moved the tank back into position. Last night I mounted the lights. I will drill the sump this weekend because I have plans tomorrow night. Hopefully Saturday I will be able to do a full run and test all the plumbing. Here are some pics of my progress.
Got her all wet! !!!!!!!!!!
Sent from my DROIDX using Tapatalk