Working on Omar's pipes

pgr11

Member
Supporter
Joined
Jul 26, 2011
Messages
11,011
Likes
92
Points
48
Location
Hesperia
#1
So work begins on Omar's plumbing. We will be here for a little bit but its won't be bad. Just waiting for him to find his 1" now so we can start
 
Joined
Apr 6, 2012
Messages
1,663
Likes
1
Points
0
Location
Canoga park
#3
man can't wait to see the work on this bad boy. going to move into my new place next week. which means starting all over. hope I can do better with this thread.

tagging along.
 

pgr11

Member
Supporter
Joined
Jul 26, 2011
Messages
11,011
Likes
92
Points
48
Location
Hesperia
#7
OK so return and manifold section done. Now for some pizza and then the drain.

Last pic is Omar working hard on the flex tubing in the overflow box. For some reason he likes the soft stuff
 
Last edited:

pgr11

Member
Supporter
Joined
Jul 26, 2011
Messages
11,011
Likes
92
Points
48
Location
Hesperia
#12
And done. Omar needs to grab one more gate valve to put on the drain but its basically finished. Came out nice and should but super quiet.
 
Joined
Jun 15, 2011
Messages
331
Likes
0
Points
16
Location
ATASCADERO
#17
Nice pipes omar!!!!!!




Came out clean i like how you split the drain is that for noise reduction? What side of the drain do you put the valve on ? And is there going to be 2 filter socks or is it a reflection?

Sent from my HTCONE using Tapatalk
 

Latest posts

Top