Although I have not updated in 3 weeks we have still been working hard on this project. Need to take pics and post them, but in the past couple weeks we layed all the granite flooring, finished building the gazebo and installed: shingle/drip edges/gutter, built the bar top, placed the BBQ in place, installed all the electrical, built the bench/planter, and built 50% of the countertop/cabinet where the fridge goes. Right now we are leveling the walkway so we can lay the rest of the slate steps from the bridge to the steps going up to the dining area.
here is a few pics of the beginning of us laying out the planter to get a final design before we got started.
driveway and side of the house back loaded up with lumber yet again